2026Completion Year

$72,913.79Rebate/Incentive

$243,045.96Project Cost

150.6kWInstalled Capacity

$29,312.41Cost Savings/year

75.4tonnes CO2e/year
GHG Reductions

154,276kWh/yearElectrical Energy Generation

Greenhouse gas emissions reductions for this project are calculated based on Alberta’s Carbon Offset Emission Factors Handbook Version 3.2

Overview

In 2026, the Town of Legal completed a 150 kW solar photovoltaic project at the SVF Sports Centre. Funded by the Government of Alberta through the Municipal Electricity Generation Program delivered by MCCAC, this project was a part of a larger project to improve energy efficiency at the recreation centre.

Approach

The 150 kW project was installed on the roof of the building with a ballasting system and consisted of 243 solar modules. The project was installed by SkyFire Energy and focused on practical, cost‑effective action to reduce energy use and emissions.

Results

The solar system is expected to produce about 150,660 kWh of clean electricity each year. This will reduce the Town’s electricity costs by roughly $29,312  annually and lower greenhouse gas emissions by an estimated 75.4 tonnes of CO₂e per year. The project is expected to reduce facility-wide GHG emissions by 36% annually.

“The MCCAC announcement of the MEG grant was a perfect fit for the Town of Legal’s $15M retrofit project of the arena and curling rink. The addition of roof top solar panels at our SVF Sports Centre marks a major step toward sustainability and energy efficiency. This project, supported by the Municipal Climate Change Action Centre, will generate clean energy, reduce costs, and cut greenhouse gas emissions—building smarter for the future.”

Mayor Andy Beaton