As part of the MCCAC’s Alberta Municipal Solar Program (AMSP), Wheatland County installed a 60.2 kW solar PV system on the roof of their Administration Building. The project was completed in November 2016.
![](https://mccac.ca/wp-content/uploads/img_1431_3-1-scaled.jpg)
Wheatland County Administration Building Solar PV
2016Completion Year
60kWInstalled Capacity
$118,790Project Cost
$32,788MCCAC Funding
64,650kWh/yearElectrical Energy Generation
41tonnes CO2e/year
GHG Reductions
Greenhouse gas emissions reductions for this project are calculated based on Alberta’s Carbon Offset Emission Factors Handbook Version 1.0
![](https://mccac.ca/wp-content/uploads/img_1431_4-1-1024x716.jpg)
![](https://mccac.ca/wp-content/uploads/img_1392_0-1-1024x768.jpg)
You must be logged in to post a comment.